16. Electromagnetic transients (EMT)

gridsim emt steps the instantaneous network (L di/dt, C dv/dt) through time at a fixed step of microseconds and records the waveform itself: every sample of a bus voltage or branch current, not a phasor. You use it when the question is about what happens in the first milliseconds after something changes: a fault applied and cleared, a breaker or capacitor switched, the voltage that recovers across a switch, or a wave travelling along a line. The output is a trajectory of the model. It is never a statement about the real grid.

When to use EMT, and when not to

Question Use
What are the steady-state voltages and flows? A power flow (5. Running power flows).
How does the system frequency move over seconds after a loss of generation? 14. Frequency studies, a centre-of-inertia model of the system frequency over seconds.
What do harmonic currents do to the network at steady state? 17. Running a harmonic study, the frequency-domain method.
What is the peak voltage or current in the first cycles after a switching event, and how does it ring? gridsim emt.

An EMT run does one forward and back substitution of the stored LU factors per time step (20 microseconds by default) and refactorises only at a switching event, so it is meant for milliseconds to a few cycles. The 0.05 s run of the worked example is 2,500 steps and took 16 ms on the captured machine (LAPTOP, 8 logical cores); the table under Choosing the time step lists wall times from 250 to 50,000 steps. A phasor study cannot show the DC offset of a fault current, a recovery overshoot or a travelling wave, because it never represents the waveform. EMT does not model machines, controls or protection: the network is passive R, L and C elements, one ideal source and any switches you schedule (see Limits).

Before you start

  • A case, in any form 19. CLI reference lists. With no case argument the run uses the uk model. All the examples here use bundled MATPOWER cases.
  • All quantities are per-unit on the case's system base. Time is in real seconds. Inductance and capacitance are derived from the case's per-unit reactance and susceptance at the case's own nominal frequency (L = X/omega0, C = (B/2)/omega0, omega0 = 2 pi f0). The MATPOWER cases run at 50 Hz, because MATPOWER files carry no frequency and the importer assumes 50 Hz (--frequency-hz declares another); case9 is the 60 Hz WSCC system and runs at 60 Hz.
  • The source frequency (--freq) is independent of the case frequency. Set --freq to the case frequency for an AC study (see Pitfalls).
  • The full flag list is in the emt section of the CLI reference.

Worked example

Apply a fault of 0.01 pu resistance at bus 5 of the IEEE 14-bus case at 10 ms, clear it at 30 ms, and record the bus 5 voltage and the current in branch 1-5, with a 50 Hz source at bus 1:

gridsim emt case14 --duration 0.05 --freq 50 --event fault:5@0.01:0.01 --event clear:5@0.03 --dt-us 20 --probe v:5,i:1-5 --out emt-fault
$ gridsim emt case14 --duration 0.05 --freq 50 --event fault:5@0.01:0.01 --event clear:5@0.03 --dt-us 20 --probe v:5,i:1-5 --out emt-fault
emt case14: 2,500 steps @ 20us, 5 factorization(s), peak |probe| 4.364, 16 ms -> emt-fault
emt: 2 floating node(s) pinned at 0 V in the initial-condition solve.
[exit 0]

Three files appear in emt-fault. summary.md restates the run:

$ cat emt-fault/summary.md
# EMT run: case14

- steps: 2,500 @ 20 us (dur 0.05s)
- source: bus 1, amp 1 pu, 50 Hz
- refactorizations: 5
- peak |probe|: 4.3636
- wall: 15.9 ms (156,918 steps/s)
- rule: Trapezoidal, CDA: True

A forward model trajectory, not a claim about the real grid.
[exit 0]

timeseries.csv holds the waveform. These are its header and the rows around the three moments of interest (the start, the fault at 10 ms, the clearing at 30 ms and the end):

$ cat emt-fault/timeseries.csv
# GridSim  -  2026-10-03 07:48:23 UTC
# code:    git 71c4e64f-dirty  |  GridSim.Core v1.95.91.0  |  build Release
# runtime: .NET 10.0.12  X64  GC=Server
# machine: LAPTOP  Microsoft Windows 10.0.26200
# cpu:     X64  -  8 logical cores  -  8 GB RAM
# simd:    Avx256  (4 doubles/step)  FMA=True
# backend: cpu
# run:     emt case14 dt=20us dur=0.05s src=bus1 amp=1 freq=50Hz rule=Trapezoidal
t_seconds,v:5,i:1-5
0,0,0
2E-05,0.00208537629,0.0281196147
4E-05,0.0082627115,0.0560790564
...
0.00996,-0.89793361,-0.665286924
0.00998,-0.89879204,-0.667134707
0.01,-0.0150150838,-0.692540163
0.01002,0.00481759349,-0.719492316
0.01004,-0.0139926538,-0.746416757
0.01006,-0.00313357157,-0.773186115
0.01008,-0.0148277463,-0.799899673
...
0.02998,-0.0341363571,-1.29817955
0.03,-0.540118702,-1.31267861
0.03002,-1.03093107,-1.31671919
0.03004,-1.4906826,-1.30737368
0.03006,-1.90437717,-1.28574674
0.03008,-2.25935233,-1.25333063
...
0.03016,-2.94333215,-1.05481048
...
0.05,-0.898367441,-0.663102626
[exit 0]

Read it as follows.

  • Before 10 ms the bus 5 voltage swings to -0.8988 pu, a 50 Hz waveform of amplitude 0.9098 pu once the start-up has passed. The branch 1-5 current is -0.667 pu at that instant.
  • At 10 ms the fault switch closes. The row at t = 0.01 already shows the faulted state: the bus voltage falls from -0.8988 pu to -0.0150 pu, a collapse limited only by the 0.01 pu fault resistance, and the branch current starts to climb (the peak of 4.364 pu in the console line is that current).
  • The small values at 0.01002 to 0.01008 s (+0.0048, -0.0140, -0.0031, -0.0148) are numerical ringing that Critical Damping Adjustment leaves behind; the first two alternate in sign (see Numerical chatter and CDA).
  • At 30 ms the fault opens at the instant requested, with whatever current the fault switch is carrying. There is no wait for a current zero, so the bus voltage does not recover to its steady 0.9 pu amplitude. It overshoots to -2.943 pu at 0.03016 s, 3.2 times the pre-fault amplitude, before settling back. That overshoot is the transient recovery voltage of the modelled circuit, and it is why a step small enough to resolve it matters (see Choosing the time step).

The time stamps, machine lines and wall times differ by machine and run. On one machine and runtime the same command gives the same probe values every time. This run uses an AC source, which evaluates the deterministic DetMath.Cos; no AC run is pinned by a digest yet. The cross-machine pins are SHA-256 digests of DC runs of five cases (gb-full, uk, case9, case30 and case33bw: sampled node voltages and the first 20 branch currents over 40 ms at 20 microseconds), listed in the technical chapter.

Reading the output

The console

The last console line has a fixed shape. In the worked example it is emt case14: 2,500 steps @ 20us, 5 factorization(s), peak |probe| 4.364, 16 ms -> emt-fault, which is these parts in order:

  • emt case14 is emt and the case argument as typed, or uk when there is none.
  • 2,500 steps is duration / dt rounded to the nearest whole step, with a thousands separator. The CSV has one more row than this, because it also holds the row for t = 0.
  • @ 20us is the step in microseconds as given to --dt-us.
  • 5 factorization(s) counts the nodal matrix factorisations. One is made at the start. Each step at which a switching event actually changes a conductance adds two with Critical Damping Adjustment (the matrix is refactored for the half step and again for the full step) and one without it, and with --rule be. The worked example has two such steps (the fault and the clearing) and reports 5 = 1 + 2 + 2. The same run with --no-cda reports 3.
  • peak |probe| 4.364 is the largest absolute value of any probe at any step from step 1 onwards. The t = 0 row is excluded. With several probes it is the maximum over all of them, so it can be a current when you meant a voltage: in the worked example the 4.364 is the branch current, and the bus voltage alone peaks at 2.943 (see the table under Choosing the time step). The console prints four significant figures.
  • 16 ms is the wall time in the integration loop. It differs by machine and run.
  • -> emt-fault is the directory the files were written to.

When the initial-condition solve finds buses with no resistive path to a reference, one earlier line goes to the error stream:

emt: 2 floating node(s) pinned at 0 V in the initial-condition solve.

It is information, not a failure: the run continues and the exit code stays 0. See Starting from rest.

summary.md

Every line of the file, in order:

Line Meaning
# EMT run: case14 The case label, as on the console.
- steps: 2,500 @ 20 us (dur 0.05s) Step count, the step in microseconds and the requested duration in seconds.
- source: bus 1, amp 1 pu, 50 Hz The one energising source: its bus, its amplitude in pu and its frequency. A DC source prints DC where the frequency would be.
- refactorizations: 5 The same count as the console's factorisations.
`- peak probe
- wall: 15.9 ms (156,918 steps/s) The integration wall time and the steps per second it implies.
- rule: Trapezoidal, CDA: on The base integration rule and whether CDA ran: on, off (--no-cda), or off (not used under backward Euler) under --rule be, where CDA never acts.
A forward model trajectory... The standing reminder that the output describes the model.

timeseries.csv

  • Comment lines beginning with # come first: the run stamp, code version, runtime, machine, CPU, SIMD tier, backend and a run: line that records the case, step, duration, source bus, amplitude, frequency and rule.
  • The column header is t_seconds followed by one column per probe, named exactly as you wrote the probe (v:5, i:1-5). With no --probe the columns are v:<source bus> and i:<from>-><to> of the first series branch, as in i:1->2 below.
  • Each following row is a time in seconds and the probe values, written with nine significant figures (2E-05 is 20 microseconds). Voltages are per-unit; currents are per-unit on the system base and positive from the from bus to the to bus.
  • The first row is t = 0 and is always zero for voltage probes. It is a placeholder, not the rest solution (see Starting from rest). The first real sample is at t = dt.
  • Loaders that do not skip # lines need to be told to; most plotting tools take a comment character.

The default probes, with the first rows of a default run:

$ gridsim emt case14 --duration 0.01 --out emt-default
emt: 2 floating node(s) pinned at 0 V in the initial-condition solve.
emt case14: 500 steps @ 20us, 1 factorization(s), peak |probe| 2.902, 5 ms -> emt-default
[exit 0]

$ sed -n 9,13p emt-default/timeseries.csv
t_seconds,v:1,i:1->2
0,0,0
2E-05,1,0.105868066
4E-05,1,0.210679488
6E-05,1,0.313621015
[exit 0]

This run uses the default DC source of 1 pu. The source bus sits at 1 pu from the first step. The first branch current sample is 0.105868 pu, against V dt / L = 0.106189 pu for the inductance of branch 1-2 (0.30 % lower).

run-metadata.json

The provenance record every GridSim run writes:

$ cat emt-fault/run-metadata.json
{
  "timestampUtc": "2026-10-03T07:48:23.1587691Z",
  "backend": "cpu",
  "gitCommit": "71c4e64f-dirty",
  "buildConfig": "Release",
  "coreVersion": "1.95.91.0",
  "runtime": ".NET 10.0.12",
  "arch": "X64",
  "serverGc": true,
  "simdTier": "Avx256",
  "simdLanes": 4,
  "simdFma": true,
  "machineName": "LAPTOP",
  "os": "Microsoft Windows 10.0.26200",
  "cpu": "X64",
  "logicalCores": 8,
  "ramGb": 8.3,
  "run": "emt case14 dt=20us dur=0.05s src=bus1 amp=1 freq=50Hz rule=Trapezoidal"
}
[exit 0]

The run field repeats the CSV's run: line. A parameters object follows the shared fields: verb, case, modelName, dtMicroseconds, durationSeconds, steps, sourceBus, amplitudePu, frequencyHz, rule (trap or be), criticalDampingAdjustment (whether CDA ran), noCdaFlag, travellingWaveLines, loads, allowNonPassive, nonPassiveElements, every probe (name, kind, target) and every event, each with the token as given and what it became (bus, time, resistance and fault switch id, or the switch ids a clear: opened).

Probes and events

Probes

--probe takes a comma-separated list.

Probe Records
v:<bus> The node voltage at that bus, in pu.
i:<from>-<to> or i:<from>-><to> The current in the series branch from bus from to bus to, in pu, positive from from to to.
  • Bus numbers are the case's bus numbers. An i: probe must name a branch that is in service and modelled as a series arm, with the buses in the branch's from-to order. Shunt elements and loads cannot be probed.
  • Where several in-service series branches join the same two buses, i:<from>-<to> is ambiguous and is refused; i:<from>-<to>#<k> names the k-th of them in case order. The default branch probe is labelled #1 when its branch has a parallel twin.
  • Under --lines, an i: probe on a travelling-wave line reads the current at the from end.
  • Every probe must name something. A v: probe on a bus that is not in the case, a non-numeric bus, a branch that does not exist, or a token that is neither v: nor i: exits 2 before anything runs, with one error: emt: probe '...': ... line per problem, for example error: emt: probe 'v:99': bus 99 is not in case 'IEEE 14-bus'.

Events

--event is repeatable. Each token schedules one switching action.

Event Effect
fault:<bus>@<t>:<Rpu> At time t seconds, close a switch from <bus> to ground with closed resistance Rpu per-unit.
clear:<bus>@<t> At t, open the fault switch that an earlier fault: token created at <bus>.
switch:<id>@<t>:close or :open At t, close or open the switch element with that id. The action word is close or open, in any letter case; any other word exits 2.
  • Each fault bus and resistance pair adds a bus-to-ground switch to the network, open until the event closes it. Its open resistance is 1e9 pu. Switch ids are numbered from 1,000,000 in the order the pairs first appear, so the first fault in a command is switch 1000000. A later fault: at a bus that is already faulted, with a different resistance, changes the bus's fault to the new resistance: the bus's other fault switches open at that instant and the new one closes. The same resistance again re-closes the same switch. The only switches the verb can create are these fault switches, so switch: is the way to open a fault without clear: or to re-close it:
$ gridsim emt case14 --duration 0.03 --freq 50 --probe v:5 --event fault:5@0.01:0.01 --event switch:1000000@0.02:open --out emt-switch
emt case14: 1,500 steps @ 20us, 5 factorization(s), peak |probe| 3.504, 11 ms -> emt-switch
emt: 2 floating node(s) pinned at 0 V in the initial-condition solve.
[exit 0]
  • An event time is a number of seconds from 0 to the end of the run. An event is applied at the first step whose time is at or after t, less a tolerance of 1e-6 of a step. An event on a step boundary is not delayed by a step, and the sample at that time already shows its effect. An event at t = 0 acts at the first step. A negative time, or a time after the last step, exits 2, because such an event would never be applied.
  • Events at the same step are applied together. They count as one discontinuity for CDA.
  • clear:<bus> opens every fault switch at that bus and needs a fault: at that bus somewhere on the command line (it may come first on the line). Two fault: events at one bus at the same instant exit 2.
  • A fault resistance must be a positive number of per-unit ohms; 0 and negative values exit 2 (a bolted fault is a small resistance, for example 1e-4).
  • A fault: naming a bus that is not in the case, an unparsable time or resistance, or any other leading word exits 2. Every problem on the command line is listed, one error: emt: ... line each, before the verb exits; a token of the wrong shape reads error: emt: bad --event '...' (use fault:<bus>@<t>:<Rpu>, clear:<bus>@<t>, or switch:<id>@<t>:close|open).
  • A switch: token naming an id that is not a switch exits 2 before any step is taken, and the message lists the valid ids: EMT case has events that cannot act: switch event at 0.01 s names element 7, which is not a switch. Valid switch ids: none.
  • Closing a closed switch or opening an open one changes nothing: no refactorisation and no CDA at that step.

Integration rules

The engine replaces each inductor and capacitor by a conductance in parallel with a history current source, built from the previous step's voltage and current, and solves the resulting resistive network every step. --rule chooses the formula that builds the companion.

Rule Flag Order Behaviour
Trapezoidal --rule trap (default) Second order Accurate for smooth waveforms: halving the step quarters the error. It does not damp anything, so a discontinuity excites a sustained numerical oscillation at half the sampling frequency (25 kHz at 20 microseconds) that decays only through real resistance.
Backward Euler --rule be First order Unconditionally stable and strongly damping: a discontinuity leaves no ringing, but the rule also damps real oscillations and halving the step only halves the error.

Choose trapezoidal (the default) for results you intend to quote. Pair it with CDA for runs that have switching events: in the worked example CDA cuts the first sample-to-sample swing after the fault from 0.184 pu to 0.020 pu (9.3 times) and keeps second-order accuracy away from the events. Choose backward Euler for a quick look at the overall shape of a response with a coarse step, for a stiff study in which any ringing would be a distraction, or to cross-check a trapezoidal result: a feature that survives both rules is physical, and one that exists only in the trapezoidal trace is numerical.

The accuracy difference is measurable. This is the overshoot at bus 5 after the fault in the worked example, as a peak |v:5|, for both rules at three steps. The reference is the 1 microsecond trapezoidal run, 2.999 pu (see the table under Choosing the time step):

Step Trapezoidal peak Backward Euler peak
100 microseconds 2.513 pu (16.2 % low) 1.992 pu (33.6 % low)
20 microseconds 2.943 pu (1.9 % low) 2.671 pu (10.9 % low)
5 microseconds 2.990 pu (0.3 % low) 2.909 pu (3.0 % low)

A whole-run backward Euler capture, with a longer step and without CDA:

$ gridsim emt case24 --duration 0.02 --dt-us 50 --rule be --probe v:1 --no-cda
emt case24: 400 steps @ 50us, 1 factorization(s), peak |probe| 1, 7 ms -> results\emt-out
[exit 0]

The DC source holds bus 1 at 1 pu, so the peak is exactly 1. --rule accepts trap or be, in any letter case; anything else exits 2 (see Refusals).

Numerical chatter and CDA

A trapezoidal step carries the previous step's inductor and capacitor currents forward. When a switch changes a conductance between two steps, the history no longer matches the new network, and the mismatch rings between the two signs from one sample to the next, at half the sampling frequency. That ringing is numerical chatter: it is not in the real circuit.

Critical Damping Adjustment (CDA) reduces it: in the worked example the first swing falls 9.3 times (below). At a step where an event changes a conductance, the engine switches to backward Euler, takes two half-steps (each of dt/2) across the discontinuity, and then returns to trapezoidal at the full step. The recorded sample at that time is the end of the second half-step. CDA is on by default and acts only under the trapezoidal rule. --no-cda turns it off.

The effect on the worked example, at the fault, with CDA (the default) and with --no-cda:

$ gridsim emt case14 --duration 0.05 --dt-us 20 --freq 50 --probe v:5,i:1-5 --event fault:5@0.01:0.01 --event clear:5@0.03 --no-cda --out emt-nocda
emt: 2 floating node(s) pinned at 0 V in the initial-condition solve.
emt case14: 2,500 steps @ 20us, 3 factorization(s), peak |probe| 4.366, 18 ms -> emt-nocda
[exit 0]

$ sed -n 510,520p emt-nocda/timeseries.csv
0.01,-0.107233042,-0.680109603
0.01002,0.0771907976,-0.706801354
0.01004,-0.067548886,-0.734009938
0.01006,0.0395528143,-0.760645177
0.01008,-0.0458202103,-0.787542396
0.0101,0.0161538229,-0.81406493
0.01012,-0.0343911902,-0.84070243
0.01014,0.00129813165,-0.867083662
0.01016,-0.0287675828,-0.893496145
0.01018,-0.00834457229,-0.919723853
0.0102,-0.0263301481,-0.945935981
[exit 0]

$ sed -n 510,520p emt-fault/timeseries.csv
0.01,-0.0150150838,-0.692540163
0.01002,0.00481759349,-0.719492316
0.01004,-0.0139926538,-0.746416757
0.01006,-0.00313357157,-0.773186115
0.01008,-0.0148277463,-0.799899673
0.0101,-0.00911614127,-0.826483955
0.01012,-0.0165407435,-0.85299814
0.01014,-0.0137305444,-0.879400387
0.01016,-0.0185499403,-0.905726424
0.01018,-0.0173321358,-0.931952843
0.0102,-0.0205287672,-0.958101528
[exit 0]

Without CDA the bus voltage alternates +0.077, -0.068, +0.040, -0.046 pu: the first sample-to-sample swing is 0.184 pu, and the alternation is still visible ten steps later at the end of the window. With CDA the first swing is 0.020 pu, a factor of 9.3 smaller, and the trace stays within 0.021 pu of zero throughout the window. The branch current i:1-5 is smooth in both runs, because an inductor current cannot jump.

CDA does not remove all ringing. The values at 0.01002 s and 0.01004 s alternate in sign even with CDA, which is the residue. Treat any alternation at the sampling Nyquist frequency straight after an event as numerical.

Use --no-cda only to see what CDA is hiding, or to compare. A run with no switching events has no discontinuity, so CDA never acts and the factorisation count stays at 1.

CDA is not free. Its backward Euler half-steps are first order, so at the same step the peak of a sharp transient reads lower with CDA than without. At 20 microseconds the worked example's v:5 overshoot reads 2.943 pu with CDA and 2.972 pu with --no-cda; at 10 microseconds 2.976 and 2.989; at 5 microseconds 2.990 and 2.996 (the 1 microsecond reference is 2.999, see the table below, and the no-CDA runs are in docs/_captures/emt/dt-sweep-nocda.txt). The gap closes as the step shrinks, which is the other way to reduce chatter: a smaller step moves the ringing to a higher frequency and shrinks it.

Choosing the time step

The step is fixed for the whole run. --dt-us sets it in microseconds, the default is 20 and it must be positive.

Three things set the step you need.

  1. Fastest phenomenon in the answer. The trapezoidal rule shifts the frequency of a waveform by a relative error of (omega dt)^2 / 12, where omega = 2 pi f. With a 20 microsecond step, a 1 kHz component is off by 0.13 % and a 5 kHz component by 3.3 % (that formula is the leading term; the exact warp, 1 - atan(omega dt/2)/(omega dt/2), gives 3.1 % at 5 kHz). A step of 1/50 of the period gives 0.13 %: at 5 kHz that is 4 microseconds.
  2. Sharpness of the event. A peak reached in a fraction of a cycle needs samples that land on it. The table below is the bus 5 overshoot of the worked example, which peaks 0.16 ms after the clearing.
  3. Line travel time, with --lines. A travelling-wave line has a delay tau, which the engine rounds to a whole number of steps (max(1, round(tau/dt))). The delay error is up to dt/2 once tau is at least dt/2; a line with tau below dt/2 is held at one step, an error of up to dt - tau. Choose dt at most one tenth of the shortest tau you care about. The charged lines of case30 have tau between 78 and 201 microseconds at 50 Hz, so --dt-us 10 gives them 8 to 20 steps of delay.
--dt-us Steps Peak v:5 (pu) Error against the 1 microsecond run Wall time (ms)
200 250 1.804 39.8 % 5
100 500 2.513 16.2 % 5
50 1,000 2.804 6.5 % 10
20 2,500 2.943 1.9 % 18
10 5,000 2.976 0.8 % 43
5 10,000 2.990 0.3 % 60
2 25,000 2.997 0.07 % 122
1 50,000 2.999 reference 208

These are the peak |probe| values of eight runs of gridsim emt case14 --duration 0.05 --freq 50 --event fault:5@0.01:0.01 --event clear:5@0.03 --dt-us <N> --probe v:5, kept in docs/_captures/emt/dt-sweep-trap.txt. The wall times differ by machine and run. The peaks are reproducible on one machine and runtime (the source is AC).

Guidance in practice:

  • 20 microseconds (the default) resolves power-frequency waveforms; in the table above it reads the sharp fault-clearing peak 1.9 % low. It is the step to start from, then halve it and re-run.
  • 5 to 10 microseconds for the peak of a fault-clearing or capacitor-switching transient that you intend to quote, and for --lines studies on lines with tau below 100 microseconds.
  • 50 to 200 microseconds only to preview the shape of a long run. A 200 microsecond step lost 40 % of the peak above.
  • Halve the step and re-run until the quantity you quote stops changing in the digits you need. In the table above the error of the peak falls by a factor of 2.4 from 20 to 10 microseconds and 2.6 from 10 to 5 microseconds, so the check is worth making and one halving is not proof of convergence.

Wall time grows with the step count but less than in proportion: 2,500 steps took 18 ms and 50,000 steps took 208 ms (11.6 times for 20 times the steps), with 5 ms at 250 steps (machine LAPTOP, 8 logical cores). The CSV grows with the step count: 50,000 steps is 50,001 data rows.

duration / dt is rounded to a whole number of steps. A --duration that is not positive, or shorter than half of one step (so the run would take no step), exits 2 naming the flag.

Starting from rest

The run starts from rest, not from the power-flow solution. The initial state is: every inductor carries zero current, every capacitor holds zero voltage, and the source is on at its t = 0 value (the DC level, or amp for an AC source, whose waveform is amp * cos(2 pi f t)). The engine solves the resistive network that this leaves (inductors open, capacitors as 0 V, resistors conducting) to seed the histories, so that the source is a clean step at t = 0 and the first step does not see a spurious ramp.

What that means for the first milliseconds:

  • The start-up is an energisation transient. The source steps from nothing to full voltage at t = 0. An AC source starts at its peak (a cosine), which is the worst case for the step. The network settles under the damping of the load conductances. This is the per-10-millisecond peak of v:5 for a 100 ms AC run with no events:
$ gridsim emt case14 --duration 0.1 --freq 50 --probe v:5 --out emt-settle
emt: 2 floating node(s) pinned at 0 V in the initial-condition solve.
emt case14: 5,000 steps @ 20us, 1 factorization(s), peak |probe| 0.9098, 35 ms -> emt-settle
[exit 0]

$ awk -F, '!/^#/ && $1+0>0 {w=int($1/0.01); a=$2<0?-$2:$2; if(a>m[w])m[w]=a} END{for(i=0;i<10;i++)printf "%d-%d ms  %.4f\n", i*10,i*10+10,m[i]}' emt-settle/timeseries.csv
0-10 ms  0.8988
10-20 ms  0.9096
20-30 ms  0.9098
30-40 ms  0.9095
40-50 ms  0.9098
50-60 ms  0.9095
60-70 ms  0.9098
70-80 ms  0.9095
80-90 ms  0.9098
90-100 ms  0.9095
[exit 0]

In the first 10 ms the first positive peak is 0.8911 pu at 0.84 ms (2.1 % below the steady 0.9098) and the largest value in the window is 0.8988 pu at 9.98 ms (1.2 % below); from 10 ms on every window peaks between 0.9095 and 0.9098 pu. A case with --no-loads, or a lightly damped one, takes longer. Schedule the first event after the start-up has settled, as the worked example does, and do not read the first cycle as steady state.

  • The t = 0 row is a placeholder. The probes record the state after each step, and the row at t = 0 is written before any step: voltage probes read 0 whatever the source. The step from t = 0 to t = dt is the first that is computed.
  • Floating buses start at 0 V. A bus with no resistive path to ground, a source or a capacitor has no defined rest voltage: every element at it is an inductor, which is open at rest. A transformer-only bus is the common case. In case14 buses 7 and 8 are of this kind. The engine pins such buses at 0 V in the initial-condition solve, solves the rest of the network properly and prints the count as the floating node(s) line. The pin sets only their starting voltage and history; from the first step they follow the network like any other bus.
  • A DC source is a step input. With --freq 0 (the default), the network settles to the resistive DC solution: inductors become shorts and capacitors open. The DC run is the cleanest way to see a settling transient:
$ gridsim emt case9 --duration 0.01 --dt-us 20 --probe v:5
emt case9: 500 steps @ 20us, 1 factorization(s), peak |probe| 1.079, 3 ms -> results\emt-out
emt: 2 floating node(s) pinned at 0 V in the initial-condition solve.
[exit 0]

Bus 5 of case9 peaks at 1.079 pu at 3.74 ms, above the 1 pu source at bus 1. This is the step response of the network's L and C elements. In a 0.2 s run the same probe reads 0.6100 pu at the last sample and is still falling slowly.

Variations

Source. The source is one ideal voltage source (no internal impedance) at the first generator's bus. --source <bus> moves it, --amp sets its amplitude in pu and --freq its frequency in Hz (0 is DC). A bus that is not in the case exits 2: emt: source bus 99 is not in the model. (Parameter 'options'). Other generators are not modelled: their buses are ordinary nodes.

Loads. By default each bus's demand Pd/Qd is a constant-impedance shunt at 1 pu: a conductance Pd/BaseMva plus an inductor for Qd > 0 or a capacitor for Qd < 0. They damp the transient to a physical settling. --no-loads omits them, which leaves a lightly damped network that rings for longer (and, in case14, 8 floating nodes instead of 2). A bus with negative demand (generation netted into the load) is modelled as a bounded current source of |Pd|/BaseMva pu shaped like the source, since a negative conductance is not passive and would diverge.

Travelling-wave lines. --lines models every charged, untapped, non-transformer branch (B > 0, X > 0) as a lossless Bergeron line with surge impedance sqrt(X/B) and travel time sqrt(X B)/omega0, in place of lumped pi sections. The series resistance is dropped in this mode. Transformers, tapped branches and branches without charging stay lumped. Use it for wave-propagation studies, and choose the step from the shortest tau (see Choosing the time step). The same case30 run, lumped and with lines:

$ gridsim emt case30 --duration 0.01 --dt-us 10 --freq 50 --probe v:2 --out emt-lumped
emt: 6 floating node(s) pinned at 0 V in the initial-condition solve.
emt case30: 1,000 steps @ 10us, 1 factorization(s), peak |probe| 1.061, 14 ms -> emt-lumped
[exit 0]

$ gridsim emt case30 --duration 0.01 --dt-us 10 --freq 50 --probe v:2 --lines --out emt-lines
emt: 8 floating node(s) pinned at 0 V in the initial-condition solve.
emt case30: 1,000 steps @ 10us, 1 factorization(s), peak |probe| 1.263, 11 ms -> emt-lines
[exit 0]

The line run reports a higher peak (1.263 pu against 1.061 pu). The lines are lossless and carry no series resistance, so the two models differ in damping as well as in wave behaviour; compare them for the wave behaviour only. The two extra floating nodes are buses that the lines join with no resistive path at rest.

Other network elements the build models. An off-nominal transformer tap is an ideal a : 1 transformer on the from side, with the from-end charging divided by a^2, as the power flow does. A branch with negative reactance (series compensation) is a series capacitor, C = 1/(|X| omega0). A branch with X = 0 and R not zero is a pure resistance. Bus shunts become a conductance and a capacitor or reactor.

Refusals and exit codes

The verb fails loud: it does not run a case it cannot model faithfully and it does not report a failed run as a result.

$ gridsim emt case14 --rule euler
error: --rule expected trap or be but got 'euler'
[exit 2]
$ gridsim emt case14 --dt-us 0
error: --dt-us expected a positive step (microseconds) but got '0'
[exit 2]
$ gridsim emt nosuchcase
emt: error loading case 'nosuchcase': unknown case 'nosuchcase'
[exit 1]
$ gridsim emt case14 --source 99
emt: source bus 99 is not in the model. (Parameter 'options')
[exit 2]
$ gridsim emt cigre
emt: EMT build: branch #12 (0->1) is a phase-shifting transformer (shift 30 deg). A phase shift multiplies the voltage phasor by a complex number, which a real-valued single-phase time-domain network cannot represent; it would be silently dropped. Remove the shift or use a phasor study. (Parameter 'model')
[exit 2]
$ gridsim emt case14 --event clear:5@0.03
emt: bad --event 'clear:5@0.03' (use fault:<bus>@<t>:<Rpu>, clear:<bus>@<t>, or switch:<id>@<t>:close|open).
[exit 2]
$ gridsim emt case14 --event switch:7@0.01:open
emt: EMT case has events that cannot act: switch event at 0.01 s names element 7, which is not a switch. Valid switch ids: none.
[exit 2]
$ gridsim emt case14 --probe v:99
emt: unrecognised probe 'v:99' (use v:<bus> or i:<from>-<to>); skipped.
emt: no valid probes.
[exit 2]
$ gridsim emt case14 --event fault:5@0.01:0 --duration 0.02
emt: EMT element 1000000 (4->-1) has a non-finite companion conductance (Infinity) at dt = 9.999999999999999E-06 s: its resistance is zero or cancels its companion resistance.
[exit 3]

The build refuses, naming the branch, what a single-phase real-valued network cannot represent: a phase-shifting transformer (the CIGRE MV benchmark and the PEGASE cases carry them), and a zero-impedance branch (R = X = 0). It also refuses an in-service branch whose end bus is not in the case, instead of silently dropping the branch.

A network with a non-passive element, a branch with a negative series resistance or a bus shunt with a negative conductance, generates energy and can grow without bound. Network-reduction equivalents carry them on purpose (case145 has 232, pglib case588 has 5). Such a case exits 2 naming the first ten elements, with error: emt: pass --allow-non-passive to run this network anyway.; with --allow-non-passive it runs, and standard error carries a warning with the count. An unknown case name exits 2; a case file that does not load exits 1.

Exit Meaning
0 The run completed and every probe value is finite. Floating-node notes do not change the exit code.
1 A case file or folder failed to load.
2 Usage error: an unknown case name, a bad flag value (including a negative --freq), a malformed, inconsistent or out-of-range event, a --duration that gives no step, a source bus that is not in the case, a probe that names nothing, a network the build refuses, or a non-passive network without --allow-non-passive.
3 Numerical failure: a singular nodal or initial-condition matrix, a non-finite companion conductance (a zero-resistance fault), or a non-finite value in any probe trajectory. The output files are not written.

Output location

--out <dir> names the output directory (default results/emt-out, relative to the working directory). The verb creates it if needed and overwrites timeseries.csv, summary.md and run-metadata.json in it. Use a separate directory for each run you want to keep.

Pitfalls

  • --freq is not the case frequency. --freq sets the source; the reactances come from the case's own frequency. A 50 Hz case driven at --freq 60 has the wrong impedance at 60 Hz. Set --freq to the case frequency (50 for the MATPOWER cases, 60 for case9) for an AC study, or leave it at 0 for DC.
  • Do not read the pre-event samples as steady state. The run starts from rest, so the first cycle is an energisation transient. Schedule events after it has settled, as the worked example does at 10 ms.
  • Peak |probe| mixes probes. It is the largest of all probe columns. Probe one quantity at a time when you quote a peak.
  • A coarse step under-reads peaks without warning. A 200 microsecond step lost 40 % of an overshoot and the run reported nothing unusual. Run the study at a second, smaller step and compare.
  • Ringing straight after an event is numerical. Alternating sign sample to sample at half the sampling frequency is chatter (see Numerical chatter and CDA). Do not quote it, and do not switch CDA off to make a trace look cleaner.
  • A fault resistance must be positive. Rpu of 0 or below exits 2; use a small resistance such as 1e-4 for a bolted fault.
  • A factorisation count lower than you expect means an event did nothing. Closing a closed switch, or opening an open one, is a no-op that adds no factorisation.
  • --allow-non-passive can diverge. A reduction equivalent with negative resistances generates energy; always check the peak against what is plausible.
  • The CSV run: line is short. It records the case, step, duration, source, amplitude, frequency and rule; the probes, events and switches are in the parameters object of run-metadata.json.
  • One output directory per run. Re-using --out overwrites the earlier files without a warning.

Three-phase studies with frequency-dependent lines, saturation and arresters (emt3)

RC4 adds a second EMT path beside emt, for studies the case-file verb cannot describe: gridsim emt3 <study.json>. It runs on a new nodal solver in SI units (volts, amps, ohms, henries, farads; GridSim.Core.Dynamics.Emt.Nodal), with a fixed time step and the trapezoidal rule. The emt verb, EmtEngine and ThreePhaseEmtEngine are not changed. The single-phase engine has a closed element list with no nonlinear element and no convolution line, so adding them there would have meant editing the numerical core; the new solver is a separate set of files that reuses only the companion-model formulas.

What a study can hold (strict gridsim-emt3/1; see the CLI reference for every key):

  • Three-phase buses, each three nodes <bus>.a, <bus>.b, <bus>.c; balanced wye sources with a series resistance and inductance; series branches given by their positive and zero sequence impedance (stamped as coupled phase matrices); wye shunts.
  • Lines from the line constants (R4-04). Model bergeron is a constant-parameter travelling-wave line: the surge impedance and travel time of each mode (zero sequence, positive sequence twice) from the geometry at its stated frequency, lossless apart from an attenuation exp(-R l / Zc) that is exact only for a distortionless line (R/L = G/C). Model fd fits the characteristic admittance and the propagation function of each mode over a stated band, from the geometry solved at every band frequency (so the earth-return integral supplies the frequency dependence), with real-pole vector fitting; the line then runs by recursive convolution. The result reports the fit error of every mode, the delay removed from the propagation function, and any passivity correction.
  • Faults and switching: shunt faults on any phases, to ground or to an isolated star point, applied and cleared at stated times; three-phase breakers with scheduled events. Events act at the first step boundary at or after their time (quantised up to the step grid, an error of at most one step; there is no interpolation back to the exact instant). event_rule chooses a normal trapezoidal step or one backward-Euler step at each event.
  • Nonlinear devices: surge arresters (power law i = Iref (|v|/Vref)^alpha, or a piecewise-linear V-I table), saturable shunt inductors (a piecewise-linear current-flux curve, with an initial flux) and saturable transformer banks (three single-phase T-model units, secondary referred to the primary). Each step solves the nonlinear elements by Newton iteration with a fixed iteration limit, fixed tolerances and a fixed number of step-halvings; a run that does not converge stops with the status NewtonNotConverged and the time of the failure. The traces end at the last good step; the last value is never repeated.
  • Rotating machines (optional machines, the R4-17 Core models): a synchronous machine in dq coordinates with field and damper windings and the swing equation, started from a no-load or a phasor operating point, with mechanical-torque and field-voltage steps; a single-cage induction machine in the stationary frame with a speed-dependent shaft load, started from standstill or a stated speed. Outputs add speed, torque, rotor-angle and field-current. The synchronous machine uses the RMS parameter set (xd, xdp, xdpp, tdop and so on), so the same machine data run in both the RMS and the EMT studies.
  • Converters and DC buses (optional dc_buses, converters, the R4-17 Core models): a split DC link with an optional supply, and three-phase two-level voltage-source converters on it, either the average-value model or the switched bridge with sine PWM, driven by an open-loop modulation or by the sampled dq current controller behind a filter. Each result names the model class of every converter and the switching-timing contract. Grid-forming and grid-following inverters exist only in the older phase-domain engine and are not offered here.
  • HVDC (optional hvdc, the R4-19 Core models): VSC stations (two-level average-value, MMC arm-average or MMC sub-module level, with the dq current controller and an outer power or DC-voltage loop), line-commutated 6- and 12-pulse bridge groups into an R-L load, and two-pole DC lines (Bergeron) between stations that start in a steady state carrying a stated current. Each station and bridge has its own AC source. The partitioned parallel run, the RMS-EMT co-simulation interface and the DC fault cases of the Core remain library APIs.
  • Outputs: node voltages, element currents (a line end, a branch phase, an arrester, a source, a machine, a converter filter), flux linkages, machine quantities, DC rail voltages and DC currents, with a sample interval.

Every result states the step, the method, the Newton tolerances, how many times the linear matrix was factored, the Newton iteration counts and the fit errors. A run is bit-identical on every repeat and at every thread count: the solver is single-threaded, with fixed element order and fixed summation order.

Order of work in a step: apply due events; history terms and source values at t + dt, in element order; Newton iterations (if any nonlinear element); accept and update every history, in element order. A run starts from rest. A source that is not zero at t = 0 switches on at the first step, which shifts the trapezoidal response by half a step; the validated cases start their sources at zero.

What is validated, and against what. All oracles are derived in the tests, not read from a tool:

  • the series RLC response to a sinusoid from rest, and a switched RLC, against their closed forms, with observed order 2 when the step is halved;
  • lossless line reflections against a reflection-coefficient lattice, the open-end voltage doubling, matched-end absorption, and the travel time;
  • a distortionless line (R/L = G/C): a step arrives attenuated by exp(-(R/Z0) x), and the vector fit of that data is exact;
  • the open-ended frequency-dependent line: the simulated sending-end impedance against the analytic Z0 coth(gamma l) computed from the R4-04 line constants at the test frequency, with the fit error and the simulation error reported separately;
  • the arrester operating point of a DC source through a resistance against an independent bisection, and the V-I characteristic traced by a ramp against the defined curves;
  • the saturable inductor: the peak flux linkage lambda_residual + 2 Vpk / w on energisation at voltage zero, and the current on the piecewise curve at every step;
  • a three-phase bolted fault against the positive-sequence R-L closed form, including the d.c. offset;
  • the converters through a study document: the average-value converter's phase current against the closed form (m Vdc / 2) / (R + Rs + j w L) within 0.1 per cent, the switched converter's fundamental within 1 per cent of it and of the average model, no carrier-frequency voltage from the average model, and the current-controlled switched converter with a DC link against the sampled-loop step response (within 6 per cent of the reference) and the power-balance link voltage (within 1 per cent). These are the R4-17 Core tests reached through gridsim emt3, with a grounded star-point load because a study cannot describe a floating one. An example document is docs/examples/emt3/converter-current-control.json;
  • HVDC through a study document: the LCC bridge group's mean DC voltage and current against the closed form Vd = N [Vd0 cos(alpha) - (3 w Lc / pi) Id - 2 (Ron + Rs) Id] for 6 and 12 pulses (within 0.6 per cent); the two-station VSC link against the load-flow solution of the same link (the start within 0.2 per cent, the steady state within 0.5 per cent) and the DC closed form P = Vd1 (Vd1 - Vd2) / R; and the MMC station, arm-average against sub-module level (AC current within 1.5 per cent, DC current within 2 per cent) with the DC power balance. These are the R4-19 Core tests reached through gridsim emt3; the MMC arm-voltage equations and the circulating-current closed form of the Core tests need arm internals the document does not expose, so they stay Core-level. Example documents are docs/examples/emt3/hvdc-lcc-bridge.json and docs/examples/emt3/hvdc-vsc-mmc-station.json;
  • the synchronous machine through a study document: a phasor start on a stiff bus holds the phasor steady state (current, torque, field current, load angle, speed), the sudden three-phase short circuit follows the classical X''d, X'd, Xd envelope and the d.c. time constant, and a mechanical-torque step accelerates the rotor at delta T / 2H; the induction machine's direct start ends at the slip of the equivalent-circuit torque balance with the locked-rotor inrush above three times the running current. These are the R4-17 Core tests reached through gridsim emt3; the short-circuit traces are bit-identical to the Core call. An example document is docs/examples/emt3/machine-short-circuit.json.

What is not validated. The machine, converter and HVDC models are checked against closed forms and the load-flow link solution only. Nothing has been compared with PSCAD, EMTP or any other tool (no comparator was available; the status is COMPARATOR-UNVERIFIED, and the result summary of a study that uses them says so). The saturable transformer inrush waveform is checked only qualitatively (one-sided pulses, once per cycle). Not modelled: hysteresis and remanence at zero current (the current-flux curve is single valued), core-limb coupling and a zero-sequence flux path in the transformer, delta windings and a general ideal-transformer ratio (the secondary is referred to the primary), the universal line model, cables with sheath and armour modes beyond what the line constants give, skin effect in the conductor resistance (it is an input), ferroresonance studies, stochastic switching, and the arrester's frequency-dependent (dynamic) behaviour. A frequency-dependent line is fitted over its stated band and is not validated outside it; its poles are real, and a transient that needs a lightly damped resonance of the line itself is represented only as well as the fit allows. Passivity is enforced on the fitted line alone (a real characteristic admittance and a propagation function of magnitude at most one, on a dense grid a decade beyond the band each way); it does not prove the stability of the whole network. The step must not exceed the shortest travel time of any line mode.

Partitioned runs, HVDC and MMC models, and RMS-EMT co-simulation (library API)

These are typed Core APIs on the three-phase nodal solver (Dynamics/Emt/Nodal). The VSC and LCC HVDC stations and the MMC models also run from a study document through the hvdc key of gridsim emt3 (described above); the partitioned run and the co-simulation interface have no CLI verb. Nothing here was compared with PSCAD, EMTP or the CIGRE benchmark waveforms (the benchmark parameter sets are public; its expected waveforms are tool output). Every check below is against a closed form or the load-flow solution, written out in the test that runs it.

Partitioned parallel run (Dynamics/Emt/Partition). A network is described as named partitions joined by Bergeron lines (PartitionedModel). A partition may be cut only at a line whose travel time is at least one step, so each end reads a wave that an earlier step wrote; the partitions then run floor(travel / step) steps (the smallest over the cut lines) between exchanges, in parallel, and wait at a barrier. PartitionedEngine.Run is bit-identical to the single-partition run (the same model built as one network and run on NodalSolver) and to itself at every thread count: no sum crosses a partition, and each partition factorises its own block of the block-diagonal nodal matrix in the same order. The test runs four partitions (a thyristor bridge, a VSC station, a line whose travel time is 8.2 steps, scheduled faults) at 1, 2, 3, 4 and 16 threads and compares every probe sample bit by bit. A partitioned run refuses networks with nonlinear (Newton) elements, because the Newton convergence test covers every node and so is not separable, and the backward-Euler event rule, because the incumbent applies it to every element when any element switches. Use the single-partition form for those.

MMC (Dynamics/Emt/Hvdc). Each leg has two arms of N half-bridge sub-modules, an arm resistance and an arm inductance. Insertion is n_u = 1/2 - m/2 + z, n_l = 1/2 + m/2 + z; the arm sum-capacitor voltage obeys C_arm dV/dt = n i with C_arm = C_sm / N. Two forms: the arm-average model, and a sub-module-level model with nearest-level insertion and balancing by a sort of the capacitor voltages with the sub-module index as the tie-break (the choice does not depend on the sort algorithm). A circulating-current suppression control works on the negative-sequence second harmonic in a frame rotating at twice the grid frequency. Checked: the DC current Idc = 3/4 m I cos(phi) from the energy balance (200.693 A against 200.707 A), the DC loop law for the mean arm voltage, the pole-voltage fundamental from the arm voltage law including the capacitor ripple (rel. 1.8e-3), the arm energy ripple at the fundamental, and the second-harmonic circulating current (19.76 A against 19.42 A from the average-value equations, which include the feedback of the circulating current into the ripple); with suppression it falls to 0.01 A. The sub-module-level and arm-average models agree on the AC current to 0.14 %.

DC fault. A pole-to-pole fault at the converter DC bus behind a DC reactor: the current rises at V/L from the first step (5.994e6 A/s against 6.000e6 A/s: the reactor branch plus three legs of V_dc / 2 L_arm) and follows the series R-L-C response of the arms.

VSC HVDC link. VscHvdcStation builds a station (grid source, phase reactor, two-level average-value or MMC converter, DC link, dq current loop, and a power or DC-voltage outer loop). Two stations joined by a DC line cut into two partitions reproduce the load-flow VscDcLink solution (I = 385.19 A against 385.16 A, Vd1 = 20770.3 V against 20770.3 V) and the closed form P = Vd1 (Vd1 - Vd2) / R; the run starts from the load-flow state (the line takes an initial steady state through NodalBergeronLine end SetInitialState).

LCC. LccBridgeEmt is a six- or twelve-pulse thyristor group with floating transformer neutrals and a firing delay read at every step. Closed forms: Vd = N (Vd0 cos(alpha) - 3 w Lc Id / pi - 2 (Ron + Rs) Id); six pulse 402.1 A against 402.8 A, twelve pulse 767.4 A against 768.9 A.

RMS-EMT co-simulation (Dynamics/CoSim). RmsEmtInterface places the equivalent of the RMS side at a three-phase boundary: a Thevenin (EMF behind a series R-L) or a Norton (current source with a shunt R and L) equivalent, fitted at the fundamental. At a fixed exchange interval the EMT side measures the positive-sequence phasor over one fundamental cycle, the RMS side returns its equivalent, and the EMT source holds that phasor with continuous phase until the next exchange; an RMS event reaches the EMT side after at most one interval plus one step. The impedance is fixed for the run. The RMS side here is a phasor model built alongside (PhasorSide): the RMS transient kernel runs a whole case and has no entry that advances it to a time and exchanges a boundary quantity. Steady state agrees at the interface to 2e-5 between the all-EMT network, the RMS+EMT network and the phasor closed form. At a load step the two differ in what the RMS equivalent cannot represent: the line is a surge impedance for two travel times (the instant after the step follows v0 (Gc + Gp) / (Gc + Gp + Gx) on the line and v0 Gp / (Gp + Gx) in the equivalent), the difference is 369 V rms in the first 3 ms and 0.2 V from 20 ms on, and the fundamentals agree. The co-simulation is bit-repeatable with itself and is not bit-comparable with either parent run.

Limits

  • The emt verb is single-phase (one node per bus, positive sequence). The three-phase engine (ThreePhaseEmtEngine), with inter-phase coupling and unbalanced faults, is a library API only: it needs per-phase sequence data that a case file does not carry, so there is no CLI verb for it. See the technical chapter.
  • A phase-shifting transformer cannot be modelled and the build refuses it, so the CIGRE MV benchmark and the PEGASE cases do not run.
  • The CLI energises the network with one ideal source (no source impedance, no phase offset: the waveform is amp * cos(2 pi f t)). It cannot place several sources, give the source an internal impedance or start it at another phase.
  • Generators, converters, controls and protection have no model in the emt verb; only the passive network, the source, loads as constant impedances and the switches you schedule act.
  • Faults from the CLI are bus-to-ground only, through one resistance. There is no line-to-line or mid-line fault, and no wait for a current zero at clearing.
  • Under --lines the lines are lossless: series resistance is dropped.
  • A run starts from rest, not from a power-flow operating point, so a study that needs the network loaded to a power-flow state before the event cannot be started from the CLI.
  • The t = 0 row of voltage probes is zero by construction, not the initial state.
  • The limits of the emt3 verb are listed in its own section above (nothing compared with a commercial tool; no hysteresis).
  • HVDC and MMC models are reachable through the hvdc key of emt3 (stations, bridge groups, DC lines). The partitioned run and the co-simulation API have no verb. Not built: multi-terminal DC grid dynamics, DC breaker models, wide-band HVDC control replicas, converter dead time and device-level MMC sub-modules (IGBT switching), a PLL, and an RMS side that is the full RMS kernel.